News
Position: HomepageNews
News

Huachang New Factory Intro

Font size: AAA

1. Raw Material

1.1 Aluminum Billet

1.2 Aluminum Bar Casting Furnance

1.3 Ingot Casting Furnace

制服邪魔暖暖  

2. Tool Shop

制服邪魔暖暖 2.1 Mold Workshop

2.2 Mould works Shop Top View

制服邪魔暖暖 2.3 Mould

2.4 Mold Warehouse

 

制服邪魔暖暖 3. Extrusion Workshop

3.1 Extrusion Workshop

3.2 5000 US Ton press

制服邪魔暖暖 3.3 Material Laying Platform

3.4 Profile sections

制服邪魔暖暖 4. Surface Treatment

制服邪魔暖暖 4.1 Anodise Preparing

制服邪魔暖暖 4.2 Computer Control and Operation

 

4.3 Horizontal Anodise Line

4.4 Powder Coating

4.5 Sandblasting Machine

4.6 Vertiacal Anodise Line 4

4.7 Vertical Anodise Line

制服邪魔暖暖 4.8 Vertical Anodise Line 3

制服邪魔暖暖 4.9 Vertical Powder Coating Line

 

 

5.  Stock and Delivery

5.1 Trasit to Loading

5.2 Transit

5.3 Loading Area

5.4 Automatic Smart Warehouse System

5.5 Loading Platform

5.6 Finish Loading

 

Update: 2013-07-30 15:27:12 | Back | Close
制服邪魔暖暖 © 2012 Huachang Aluminum Factory Co., Ltd